Perizinan Berusaha & PB UMKU

Building Approval (PBG) and Certificate of Occupancy (SLF)

← All ALLMAR Law & Permit services

Short answer

ALLMAR's law unit handles PBG building approval and SLF applications from the legal side: checking land and lease status, choosing the SIMBG or OSS route, preparing the file and supporting consultations with the reviewers. A PBG is needed before construction and an SLF before the building is used.

ALLMAR's law unit handles PBG and SLF applications from the legal and permit side. PBG (Persetujuan Bangunan Gedung) is Indonesia's building approval, and SLF (Sertifikat Laik Fungsi) is the certificate that a finished building is fit for use. We check the land rights behind the project, choose the right filing route through SIMBG or the OSS system, prepare the administrative file, and respond in writing to the reviewers' notes. A PBG must be in hand before construction starts, and an SLF before the building is occupied. Technical drawings are still prepared by a certified planner, and the final decision rests with the local technical agency and the one-stop licensing office (DPMPTSP).

What PBG and SLF cover

A PBG approves the technical design for constructing a new building, or for altering, extending, reducing or maintaining an existing one (PP 16/2021 Article 253(3)). The owner applies before construction begins. An SLF is issued after a fitness-for-use inspection confirms the building is ready, and it must be obtained before the building is used (Article 274(2)).

Every PBG records the building's function. PP 16/2021 Article 4 lists residential, religious, business, social and cultural, special and mixed functions. The function decides which technical standards apply and feeds into the levy calculation. When the function or classification changes, for example a house turned into an office or a boarding house turned into a guesthouse, the owner must apply for an amended PBG.

An IMB issued before PP 16/2021 stays valid until it expires (Article 346(2)). Later physical or functional changes follow the PBG rules.

Ask on WhatsApp

Two filing routes: SIMBG and OSS

Individual owners file through SIMBG, the building management information system at simbg.pu.go.id (Article 253(9)). Businesses constructing premises for their operations file through the OSS system, because PBG and SLF are basic licensing requirements alongside spatial-use conformity (KKPR) and environmental approval (PP 28/2025 Articles 12, 106 and 110).

Both routes share two main stages: planning consultation, then issuance. The planning consultation carries no charge (PP 16/2021 Article 253(8) and PP 28/2025 Article 109(2)). What the applicant pays the region is the PBG levy (retribusi).

Technical review is carried out by an expert panel (TPA) or a technical assessment team (TPT). The TPT reviews single houses of one storey up to 72 m² and two storeys up to 90 m²; all other buildings go to the TPA (Article 254). For those small houses the applicant may prepare the design documents under set conditions, such as using a prototype design. Otherwise, technical planning is done by a certified planning provider (Article 252). Special-function buildings are filed with the Minister and reviewed by the central TPA (Articles 253(2) and 259).

Stages and official time limits

StageSIMBG route (PP 16/2021)OSS route for business premises (PP 28/2025)
Document checkThe secretariat checks completeness and then schedules the consultation in SIMBG.Data accuracy is checked within 3 working days. If something is wrong, corrections must be sent within 5 working days.
Technical standards reviewStarts within 3 working days of registration; up to 5 sessions within 28 working days.Starts within 3 working days after the documents are declared accurate; up to 5 sessions within 26 working days.
Consultation outcomeA recommendation to issue the statement of technical compliance, or a recommendation to re-register.The same. The statement is issued within 1 working day of the recommendation.
LevySet by the technical agency from an integrated index and the unit rate fixed by the regency or city.The amount is sent within 1 working day; if late, the system sets it automatically. If it is not paid within the regional deadline, the application lapses.
IssuanceThe DPMPTSP issues the PBG once proof of payment is received.The PBG is issued after proof of payment is uploaded to OSS.

These limits bind the agencies, but the clock only runs once the file is declared complete or accurate. One rule matters for applicants: the expert panel's technical comments must be concrete and comprehensive, and cannot be changed or added to at later sessions (Article 255(5)). If new points appear in a second round that were not in the earlier minutes, that rule can support a written response.

Buildings already standing without an IMB or PBG

Many buildings go up before the paperwork is done. Under PP 16/2021 Article 346(3), a building that already stands without a PBG must go through the SLF process to obtain one. The usual sequence is:

  1. A fitness-for-use inspection by a technical assessment provider, or by the TPT for certain buildings. The building is compared with the technical standards that applied when it was built.
  2. The assessor issues a report and recommendation. If the as-built drawings differ from the PBG but the building meets the standards, the recommendation is an amended PBG. If there is damage, repairs or structural retrofitting come first, before the fitness statement is given (Article 283).
  3. For buildings with no PBG, the SLF is processed together with the PBG through SIMBG (Article 286(2)).

Businesses have a dedicated route. Under PP 28/2025 Article 123(1), a business whose building stood without an IMB or PBG before that regulation took effect (5 June 2025) does not need to obtain a PBG. It may apply for the SLF directly when applying for, or renewing, its business licence through OSS. The fitness inspection is carried out by a technical assessor or a team formed by the regional government (Article 122(3)). This route is tied to business licensing; owners of homes or non-business buildings still follow PP 16/2021.

Legal points that are easy to miss

Building on someone else's land

If the building sits on leased land or land owned by another party, a land use agreement is needed. It becomes an attachment to the SBKBG (Article 275(4)). Check that the agreement allows construction, how long it runs, and who owns the building when the lease ends. The applicant's name should also match the land records and the agreement.

Renting space in a shared building

A trading or service business operating in a shared building or complex does not need to meet the basic requirements itself if the building manager already holds the KKPR, environmental approval, PBG and/or SLF (PP 28/2025 Article 13). Before signing a lease for an office, shophouse or kiosk, ask the manager for copies of the building's PBG and SLF. Without them, the burden of obtaining them may shift to you.

Sales, financing and strata units

The SBKBG records the land title status, the PBG number and the SLF or renewal number, and may carry a fiduciary deed when the building is encumbered (Article 275). Before buying or financing a building, compare the PBG drawings with the physical building and check the SLF's validity. If parts of a building are to be transferred separately, the PBG application needs a unit division plan (Article 253(11)), and the SBKBG later needs a deed of separation (Article 278).

Administrative sanctions

As an example, for owners who do not comply with the function stated in the PBG, PP 16/2021 Article 12 lists written warnings, limits on construction work, temporary or permanent suspension of work or use, freezing or revocation of the PBG and SLF, and demolition orders. Getting the approval right at the start is usually far lighter than fixing things after a sanction.

How ALLMAR handles it

  1. Needs and documents are reviewed first. We review the land title, lease or land use agreement, KKPR, any earlier IMB and the intended function, and decide whether the route is SIMBG or OSS.
  2. A written work plan and fee are agreed before we start. It sets out the split of tasks with the planner or technical assessor you appoint, the expected stages, and confirms that the regional levy is paid separately by the applicant.
  3. Processing. We prepare the applicant and building data, support the uploads, attend consultation sessions with the planner and draft written responses to each set of minutes.
  4. Progress reports. You are updated at every stage, including revision notes, the deadline for sending corrections and the levy payment deadline, so the application does not lapse.
  5. Handover with reminders of the next obligations. The PBG or SLF and attachments are handed over with notes on the SLF renewal date, when an amended PBG is needed and periodic inspections.

We do not promise that a PBG or SLF will be issued by a given date. Technical assessment and issuance are within the agencies' authority.

Checklist before you start

  • Land title in the applicant's name, or a land use agreement with the landowner.
  • Applicant identity; for a company: NIB, deed of establishment and proof of the signatory's authority.
  • KKPR and environmental approval where your activity requires them.
  • The city planning information (KRK) for the plot, which sets the local building rules.
  • A building function and classification that match the actual intended use.
  • Architectural, structural, mechanical, electrical and plumbing design documents from a certified planner.
  • For existing buildings: any earlier IMB or PBG, as-built drawings and the fitness inspection report.
  • A unit division plan if some units will be sold or transferred separately.

Common mistakes

  • Starting physical work before the PBG is issued, assuming the approval can follow later.
  • Declaring a function that differs from the planned use, such as residential when the building will be a business warehouse.
  • Signing a long lease without checking the building manager's PBG and SLF.
  • Missing the correction deadline or the levy payment deadline, so the application is rejected or lapses.
  • Changing the design during construction without an amended PBG, so the as-built drawings do not match and the SLF is held up.
  • Buying a building without comparing the PBG drawings with what was actually built.
  • Forgetting that an SLF expires and must be renewed.

After it is done

Once the PBG is issued, construction follows the approved documents and supervision records are kept. When the building is finished, the fitness statement is uploaded to SIMBG. The SLF and SBKBG are issued together within 3 working days of that upload, without charge (PP 16/2021 Article 276).

The SLF must be renewed: every 20 years for single and terraced houses, and every 5 years for other buildings. Renewal starts with a fitness inspection paid for by the owner or user (Article 297). Owners or users also carry out periodic inspections of building components (Article 295). Where a building is owned or used by several parties, the building manager is responsible for maintenance and SLF renewal (Article 294). Any change of function, or a physical change within the scope of the PBG, needs an amended PBG.

FAQ

How is a law unit's PBG service different from an architect's?

A certified planner prepares the drawings and technical calculations. The law unit checks land status and agreements, chooses the SIMBG or OSS route, prepares the administrative file, attends consultations and answers reviewers' notes in writing. The two roles complement each other.

Is a PBG the same as an IMB, and is an old IMB still valid?

The PBG replaced the IMB under PP 16/2021. An IMB issued before then stays valid until it expires. If the building's function changes, or it is physically altered within the scope of a PBG, the change follows the PBG rules.

My building already stands without an IMB or PBG. What should I do?

Start with a fitness-for-use inspection by a technical assessor. Under PP 16/2021 such a building goes through the SLF process to obtain a PBG, and both are processed together in SIMBG. A business whose building stood before 5 June 2025 may apply for the SLF directly through OSS when handling its business licence (PP 28/2025 Article 123).

How long does a PBG take?

The regulations set limits for the agencies, for example technical review of up to 5 sessions within 28 working days in SIMBG or 26 working days on the OSS route. The overall time depends on how complete the file is, how many revisions are needed and when the levy is paid. ALLMAR works within your budget: share your budget range and our team fits the scope of work.

How is the PBG levy calculated?

The technical agency sets it from an integrated index, based on the building's function and classification, multiplied by the unit rate fixed by the regency or city. The levy is paid directly to the region and is separate from any service fee.

Does a tenant of a shophouse or office need its own PBG?

Not always. A trading or service business in a shared building can go straight to business licensing if the building manager already holds the KKPR, environmental approval, PBG and/or SLF. Ask for copies before signing the lease.

How long is an SLF valid?

An SLF must be renewed every 20 years for single and terraced houses, and every 5 years for other buildings. Each renewal starts with a fitness-for-use inspection.

Subscribe to ALLMAR regulation updates & business tips